A 20-foot cable hangs from the top of a building that is 50 feet high. if the cable weighs 2 pounds per foot, how much work is done in lifting up the entire cable to the top of the building?

Respuesta :

20*2=40
40*50=2000
2000/60=33.33
about 33 hours by lifting by hand